Berglund completed the renovation of the existing Rubloff 4th floor encompasses the establishment of a fully operational Cytogenetics Laboratory. Complete with state-of-the-art wet lab, dry lab, and freezer lab facilities, along with associated support spaces. The upgrade also incorporates the installation of advanced medical gas infrastructure and specialized fume hoods, ensuring a cutting-edge environment conducive to precision research and analysis.
This comprehensive refurbishment is poised to elevate the facility to the highest standards of functionality, safety, and technological advancement within the field of cytogenetics.