Project Overview
Berglund Construction performed the equipment change out, architectural, structural, and MEP upgrades to house a new Varian Linear Accelerator Machine. The scope included removal of existing concrete slab, new concrete slab for new base frame and conduits, new finishes inclusive of new ceiling and lighting, millwork, and modifications to the control area.