Project Overview
Berglund Construction was selected to perform the fire alarm upgrades to both the Cadillac Theatre and the Ford Center for the Performing Arts Oriental Theatre. Berglund’s work crew had to touch every inch of these ornate and historic theatres in order to install the fire alarm equipment. Discreet, open-area smoke detection systems were installed as was necessary voice panels, control panels and network media systems.