Berglund Construction carried out a facade repair project on a high-rise, using a swing stage from the 30th floor. The project included cornice repairs, tuckpointing, concrete repairs, and painting railings, combining safety with skilled craftsmanship in building restoration.
- 
      Project Type- All
 
- 
      Status
- 
      Delivery Method- Lump Sum
 
- 
      Services
- 
      Location- Chicago, IL
 
- 
      Duration- 5 months
 
- 
      Size- N/A
 
- 
      Architect- KGH