Lockport Township High School District 205
Ceiling Replacing Project
  • Project Type
    • Building
  • Status
  • Delivery Method
    • Lump Sum
  • Services
  • Location
    • Lockport, IL
  • Duration
    • 4 Months
  • Size
    • 180,000 sqft
  • Architect
    • DLA Architects

Project Overview

Berglund successfully executed a ceiling renovation project at Lockport Central High School, encompassing structural reinforcement, masonry restoration, and the installation of state-of-the-art ceiling systems. The project incorporated insulation, fire-resistant materials, acoustical treatment, and energy-efficient LED lighting.

Lockport Central Campus was closed down directly after a ceiling collapse in one of the third floor classrooms. It was critical for Lockport Township Highschool staff, students, and community members to get the repairs done with a high level of quality and in time for the Fall 2024 school year. Lockport had a successful grand opening on time!